BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Open Forum Enterprise Pte Ltd - ECPv4.3.1.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Open Forum Enterprise Pte Ltd
X-ORIGINAL-URL:http://www.openforum.com.sg
X-WR-CALDESC:Events for Open Forum Enterprise Pte Ltd
BEGIN:VEVENT
DTSTART;VALUE=DATE:20170424
DTEND;VALUE=DATE:20170426
DTSTAMP:20260607T055923
CREATED:20170110T033210Z
LAST-MODIFIED:20170426T070319Z
UID:585-1492992000-1493251199@www.openforum.com.sg
SUMMARY:Commissioning & Start-Up with API RP 1FSC
DESCRIPTION:\n \t Overview\n \t Who will attend\n \t Trainer \n \t Case studies\n \t Partners\n \t Venue \n \t Industry Insights \n \t Brochure Download\n\n\n\nThis is a 3-day intensive training approved by the American Petroleum Institute (API) covering the important phases of Commissioning to initial project Start-Up of Onshore Process Plants and Offshore Production Facilities. The course of study is aimed to be in alignment with API RP 1FSC Recommended Practice for Facilities Systems Completion Planning and Execution\, 1st Edition\, published in July 2013.\n\nThe overall learning objective is for attendees to become knowledgeable in Systems Completion and familiar with vital strategies for successful Commissioning and Start-Up of projects\, on time and safely\, embedded within the guidelines of API Recommended Practice\, 1 FSC 1st  Edition.\n\nKey takeaways from attending this workshop:\n\n \tMaster design requirements imposed by Commissioning and Start- Up\n \tDiscover vital strategies to deploy for successful Systems Completion through Commissioning and Start-Up\n \tGain insights to current performance\, future outlook and best practices in the industry.\n \tFulfil requirements for quality control in the commissioning process\n \tEmploy high safety standards to ensure that both assets and personnel are protected\n \tEnsure processes are operated and running optimally with correct calibrations and maximised performances\n\n \n\n\n\nManagers\, Engineers\, Technicians and Operators\, currently or soon to be\, involved in Systems Completion and Commissioning. Operators\, Designers and office-based engineers about to become involved in Systems Completion through Commissioning and Start-Up.\n\n \n\n \n\n\n\nWorkshop Trainer:\n\nWorkshop Trainer is the founder of Falcon Global and Global Falcon Americas\, and driving force behind the creation of the highly successful\, world-class Asset Verification Management software solutions branded as Zenator Systems and the legacy product\, PathMaker Systems.\n\nMuch of his early professional experience was gained internationally in Europe and South East Asia\, representing major Operators (Shell\, Atlantic Richfield) and Contractors in engineering and project management positions in the execution of large projects.\n\nFrom 1997 to 1999\, Workshop Trainer was a consultant to a firm of Norwegian drilling and exploration contractors\, leading successful claims and cost recoveries on projects for the conversion of semi-submersible drilling rigs. From 1996 to 1997\, he held the position of Business Manager for the eastern region at Brown & Root-AOC in Aberdeen and Gt Yarmouth\, then was head hunted to briefly become Managing Director of KYE Ltd\, a family-owned\, UK-based contracting company.\n\nWorkshop Trainer has been a Chartered Engineer and Member of the Institute of Marine Engineering\, Science & Technology (IMarEST) since 1985. He helped to form the East of England branch in 2001 and served as its first Chairman to 2003\, remaining a Committee member until 2013. Workshop Trainer was awarded the President’s Commendation for outstanding contributions to the IMarEST in 2006.\n\nIn May 2012\, the Gulf Coast branch of IMarEST\, centred in Houston\, honoured Workshop Trainer by electing him to the position of Chairman of one of the fastest growing\, most affluent\, dynamic and strategically important branches around the world.\n\n \n\n \n\n\n\nAttendees will gain in-depth knowledge in Systems Completion and become familiar with vital strategies for successful Commissioning and Start-Up of projects within the guidelines of API Recommended Practice\, 1 FSC 1st Edition.\n\n \n\n \n\n \n\n\n\nInterested in partnering with us?\n\nPlease contact us to discuss your requirements.\nClick here to get in touch with us.\n\n \n\n\n\nWorkshop venue to be confirmed\n\n \n\n\n\n[contact-form-7 id="177" title="Commissioning & Start-Up"]\n\n\n\n\n\n
URL:http://www.openforum.com.sg/event/commissioning-start-up-with-api-rp-1fsc/
LOCATION:Singapore\, Singapore
GEO:1.352083;103.819836
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=Singapore Singapore;X-APPLE-RADIUS=500;X-TITLE=Singapore:geo:103.819836,1.352083
ATTACH;FMTTYPE=image/jpeg:http://www.openforum.com.sg/wp-content/uploads/2017/01/24-26-Apr-2017.jpg
ORGANIZER;CN="Open%20Forum%20Enterprise%20Pte%20Ltd":MAILTO:tickets@openforum.com.sg
END:VEVENT
END:VCALENDAR